Manufacturingoptimization
Power-grid unit commitment
Decide which generators to bring online over the next 24-48 hours to meet forecast demand at minimum fuel cost subject to ramp + min-up constraints. Daily ISO / utility workload.
Configure your run
Advanced— response time, audit level, label
Free text — rides into the decision record so audits can grep your reference (e.g. "AAPL Dec 2026 $200 call").
Sign in to run — free tier is 500/month, shared with the qlro CLI on the same key.
The same circuit shape and ranking are produced by qlro.recommend_workload("industry.manufacturing.unit_commitment") in the Python SDK — useful if you want to automate this in CI / CD.